Wednesday 21 January 2015

Before & After

One of our big jobs in 2014 was this large hardscape job.  It was one of the most exciting jobs of the summer.  Enjoy these before, during, and after shots!

This is what we had to work with initially!  As you can see, it is an 8-foot height to the door of the structure we were building up to


We ripped out the existing porch and added a wall here

We added layers of armour stone to build our heights up so that we could reach the door of the structure



Progress being made!

Travertine Slate stamp

Walls stamped and finished with different elevations going from the house to the driveway

Not the best photo, but this shows the different levels of patios going up to the outdoor structure's door.  We did the foundation for this dome structure a couple of years ago too.

The steps going up to the homeowner's outdoor structure

An aerial view showing stamped curbs and front patio area



Closing out 2014

Finally some final pictures of some 2014 jobs - to give you more ideas for your 2015 projects!  We hope everyone is thinking head to Spring!

Pool deck - rough rock stamp


Smaller driveway - Appian cobblestone stamp


2023 Season #9

  Front porch in exposed aggregate and crisp sidewalk New front porch extension with cold storage room underneath Boat ramp in charcoal colo...