Monday 2 December 2019

2019 Job Roundup #4

First up - new front entrance for this church:


New set of steps and reinstalled the existing railing.  New broomed sidewalk with some nice curves for curb appeal.







Next up - a huge broomed driveway.  Love the clean look.




A video while finishing



A before & after entrance:
BEFORE:



AFTER:

New wide set of steps and little entrance pad.  (Pad not broomed or edged yet in this photo)

New wide set of steps and little entrance pad.  (Pad not broomed or edged yet in this photo)

A couple of driveways and sidewalks for this duplex:










No comments:

Post a Comment

2023 Season #9

  Front porch in exposed aggregate and crisp sidewalk New front porch extension with cold storage room underneath Boat ramp in charcoal colo...